Accembling of battery rack and positioning of UPS

Installation and commissioning of 1MW EXL-S1 vertiv UPS at Coyah table water in Guinea west Africa With 200Ah 200pcs battery

    Prepare the Installation Area .
    Assemble the Battery Rack .
    Position the UPS
    Connect the Batteries to the UPS
    Test the System
    Safety Checks
    Testing and Commissioning.
    Training and Documentation.
    Final Inspection and Approval.