Accembling of battery rack and positioning of UPS
Installation and commissioning of 1MW EXL-S1 vertiv UPS at Coyah table water in Guinea west Africa With 200Ah 200pcs battery
-
Prepare the Installation Area
.
Assemble the Battery Rack .
Position the UPS
Connect the Batteries to the UPS
Test the System
Safety Checks
Testing and Commissioning.
Training and Documentation.
Final Inspection and Approval.