Arangement of batteries and battery links connection

Arangement of batteries and battery links connection at Coyah table water in Guinea west Africa With 200Ah 200pcs battery

    Plan voltage & Ah .
    Get batteries, links, fuses .
    Arrange batteries physically
    Connect in series / parallel / both
    Check Each Connection with a Multimeter
    Install fuses and BMS
    Connect to inverter/controller
    Safety Checks
    Testing and Commissioning.
    Training and Documentation.
    Final Inspection and Approval.